- Determine the height of the ceiling by attaching the panel to the wall according to the height desired for the room.
- Attach the panel to the ceiling center by 2 holes using expansion bolts with spaces no more than 1.20 meters.
- Attach the other end to galvanized wire and adjustable spring and connect to a hook that holds the rail (Level adjustment set)
- Attach the frames with the hook tightly and adjust to the desired level
- Attach the lower frame perpendicularly with the upper frame by the locking key
- Specify the gap of the lower frame for 9 mm, gypsum for 40 cm, and 12 mm gypsum for 60 cm.
- Follow steps 2-5 for the rest of the room and then attach the gypsum board to the frame by always using screws perpendicular to the lower frame.
- Plaster the joint between the board and screws, cover all gypsum joints by gypsum cloth tape and plaster all joints all for the rest of the room once again.
Remarks :
Hanger equipment can be used instead of the hook depending on the expertise of the contractor.
|
 |